Saint Petersburg and Leningrad Regioninfo@sirius-nerud.ru
Sirius GroupMATERIALS. MACHINERY.
CONSTRUCTION SOLUTIONS.
+7 (812) 502-14-52Discuss your project
SIRIUS GROUP · SAINT PETERSBURG & LENINGRAD REGION

Farmyard and access filling

Access to stores, work pads and turning areas for agricultural machinery.

Illustration: Temporary road materials with machinery and FAW 25 m³
Temporary road materials

What this site requires

Account for seasonal peaks, heavy machinery and soil carried onto routes. Separate product storage and clean routes from spoil; agree drainage before surfacing.

What to provide for an estimate

  • Site plan, address, area dimensions and design levels.
  • Required materials and records, quantities and measurement units.
  • Stage schedule, access restrictions and acceptance contacts.

Preparation stages

01. Survey and inputs

Layout, levels, design, utilities and equipment access.

02. Material balance and logistics

Separate inbound supply, internal movement, removal and storage locations.

03. Layers and handover

Agree sequence, inspection and acceptance scope.

Acceptance and handover

Check agreed route usability, yard profile and drainage condition.

Proposal scope

Materials, delivery, loading, spreading, compaction and removal are priced for the agreed scope. Geometric layer volume is not the same as loose delivery volume: factors, density and losses are established for the selected material. A 25 m³ FAW body does not permit 25 m³ of every load; weight and route limits govern loading.

Feasibility, timing and terms are confirmed after reviewing the brief. Design, special permits and adjacent works are included only by separate agreement.

MATERIALS · MACHINERY · PROJECTS

Applications

What to consider when selecting materials and arranging delivery.

Fleet illustration: four-axle FAW trucks with 25 m³ bodies in a quarry
MACHINERY

FAW for bulk deliveries

Four axles and a 25 m³ body. Loading is agreed according to material density and permitted weight.

Illustration of a four-axle FAW 25 m³ unloading sand and gravel and a roller at work
SITE PREPARATION

Filling and grading

The estimate considers area, layer thickness, material and on-site compaction conditions.

Illustration of a four-axle FAW with a covered 25 m³ body approaching a construction site
LOGISTICS

Delivery to site

We confirm the route, entry requirements, turning space and unloading location before dispatch.

Illustration of an industrial yard filled with crushed stone: a four-axle FAW 25 m³ and a roller beside a warehouse
INDUSTRIAL SITES

Warehouse yard

Contractor supplies are agreed against the specification, work stages and receiving schedule.

Illustration of topsoil and a residential development being prepared for landscaping
LANDSCAPING

Soil for landscaping

We clarify the soil's purpose, required volume and a suitable stockpiling area on site.

Illustration: Quarried aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Quarried aggregate

A task-specific load: quarried aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sand delivery, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sand delivery

A task-specific load: sand delivery. Composition, quantity and unloading are agreed before dispatch.

Illustration: Soil for landscaping, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Soil for landscaping

A task-specific load: soil for landscaping. Composition, quantity and unloading are agreed before dispatch.

Illustration: Asphalt for roadworks, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Asphalt for roadworks

A task-specific load: asphalt for roadworks. Composition, quantity and unloading are agreed before dispatch.

Illustration: Millings for access roads, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Millings for access roads

A task-specific load: millings for access roads. Composition, quantity and unloading are agreed before dispatch.

Illustration: Graded recycled aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Graded recycled aggregate

A task-specific load: graded recycled aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Concrete rubble and processing, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Concrete rubble and processing

A task-specific load: concrete rubble and processing. Composition, quantity and unloading are agreed before dispatch.

Illustration: Brick rubble, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Brick rubble

A task-specific load: brick rubble. Composition, quantity and unloading are agreed before dispatch.

Illustration: Coarse asphalt rubble, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Coarse asphalt rubble

A task-specific load: coarse asphalt rubble. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sand and gravel mix, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sand and gravel mix

A task-specific load: sand and gravel mix. Composition, quantity and unloading are agreed before dispatch.

Illustration: Gravel aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Gravel aggregate

A task-specific load: gravel aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Limestone aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Limestone aggregate

A task-specific load: limestone aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Fine screenings, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Fine screenings

A task-specific load: fine screenings. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sandy loam for specified fill, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sandy loam for specified fill

A task-specific load: sandy loam for specified fill. Composition, quantity and unloading are agreed before dispatch.

Illustration: Trenches and utilities with machinery and FAW 25 m³
PREPARATION STAGES

Trenches and utilities

Work scenario: trenches and utilities. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Site grading with machinery and FAW 25 m³
PREPARATION STAGES

Site grading

Work scenario: site grading. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Raising site levels with machinery and FAW 25 m³
PREPARATION STAGES

Raising site levels

Work scenario: raising site levels. Design levels, access, sequencing and acceptance guide the scope.

Illustration: On-site soil movement with machinery and FAW 25 m³
PREPARATION STAGES

On-site soil movement

Work scenario: on-site soil movement. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Winter access clearing with machinery and FAW 25 m³
PREPARATION STAGES

Winter access clearing

Work scenario: winter access clearing. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Base compaction with machinery and FAW 25 m³
PREPARATION STAGES

Base compaction

Work scenario: base compaction. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Preserving topsoil with machinery and FAW 25 m³
PREPARATION STAGES

Preserving topsoil

Work scenario: preserving topsoil. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Road slab bedding with machinery and FAW 25 m³
PREPARATION STAGES

Road slab bedding

Work scenario: road slab bedding. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Drainage layer preparation with machinery and FAW 25 m³
PREPARATION STAGES

Drainage layer preparation

Work scenario: drainage layer preparation. Design levels, access, sequencing and acceptance guide the scope.

FROM PRIVATE PLOTS TO INFRASTRUCTURE

Project types and work stages

All 24 project types ↗
HAVE A TASK? LET US FIND A SOLUTION

Let us start with your site

Tell us the material, volume and address. We will clarify the rest together.

Call us