
FAW for bulk deliveries
Four axles and a 25 m³ body. Loading is agreed according to material density and permitted weight.
This consent covers enquiries for materials, delivery, services or equipment hire. You give it by selecting the relevant checkbox before submitting the form.
I consent to TD SIRIUS-GROUP LLC (INN 7816761041, OGRN 1257800111909; 192283, Saint Petersburg, Budapeshtskaya St., 97, building 2, letter A, premises 10-N) processing the personal data I provide to review my enquiry, contact me, prepare a quotation and agree potential supply or service terms.
Consent covers my name, phone, email if provided, site address and enquiry details: material or service, volume, comments and transferred delivery calculations. The enquiry number, submission time, consent record and processing status are also saved.
Permitted operations are collection, recording, storage, updating, use to review and answer the enquiry, access restriction and deletion. Enquiries are stored in the website server database and accessed by authorised controller personnel after administration login.
Consent lasts until its purpose is achieved or it is withdrawn, unless another legal basis requires further processing. I may withdraw consent by writing to info@sirius-nerud.ru or the controller's registered address. Include the contact details used for the enquiry so it can be located.
Consent does not include advertising mailings or public disclosure. Processing arrangements and how to contact the controller are described in the personal data processing policy.
Revision date: 23 October 2026.
What to consider when selecting materials and arranging delivery.

Four axles and a 25 m³ body. Loading is agreed according to material density and permitted weight.

Before dispatch, we confirm stone type, particle size, volume and required material documents.

For a quote, specify the soil volume, loading conditions, site access and agreed receiving location.

Materials for railway works must match the design specification and ballast requirements.

The estimate considers area, layer thickness, material and on-site compaction conditions.

We confirm the route, entry requirements, turning space and unloading location before dispatch.

We select sand for the task: filling, base preparation or construction mix requirements.

We agree the composition, volume and application of millings, considering the base and future loading.

We clarify composition, fragment size and allowable inclusions. Recycled material is selected for a specific task.

Design requirements, gravel content and base construction conditions guide mix selection.

Contractor supplies are agreed against the specification, work stages and receiving schedule.

We clarify the soil's purpose, required volume and a suitable stockpiling area on site.

Composition, fragment size, loading and acceptance conditions are agreed before trucks arrive.

We clarify snow pile volume, loader access, working hours and the snow receiving location.

Dimensions, design levels and site conditions determine excavation volume and work planning.

A task-specific load: quarried aggregate. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: sand delivery. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: soil for landscaping. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: asphalt for roadworks. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: expanded clay for technical layers. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: separated recycled material streams. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: millings for access roads. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: graded recycled aggregate. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: concrete rubble and processing. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: brick rubble. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: coarse asphalt rubble. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: sand and gravel mix. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: gravel aggregate. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: limestone aggregate. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: fine screenings. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: sandy loam for specified fill. Composition, quantity and unloading are agreed before dispatch.

Work scenario: trenches and utilities. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: construction site preparation. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: site grading. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: raising site levels. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: backfilling around structures. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: on-site soil movement. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: winter access clearing. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: base compaction. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: preserving topsoil. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: temporary road materials. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: road slab bedding. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: drainage layer preparation. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: reinstatement after earthworks. Design levels, access, sequencing and acceptance guide the scope.
Shown