Saint Petersburg and Leningrad Regioninfo@sirius-nerud.ru
Sirius GroupMATERIALS. MACHINERY.
CONSTRUCTION SOLUTIONS.
+7 (812) 502-14-52Discuss your project
SIRIUS GROUP · SAINT PETERSBURG & LENINGRAD REGION

Delivery starts with your address

Saint Petersburg and Leningrad Region. Routes are planned around the material, volume and site access.

SAINT PETERSBURG AND LENINGRAD REGION

Calculate delivery

Choose a material, loading point and vehicle. Find the site address, enter at least 25 m³ and the driving distance.

Loading districts and calculation terms…

Loading point mapNo loading point selected. Click a marker on the map.
Start typing an address — at least 3 characters.
Select an address from the suggestions. Read the route distance on the map and type it manually into “One-way distance to site, km”.

Each trip costs the greater of the minimum charge or distance × rate. The rate scales with truck body capacity. Materials are separate; a partially loaded trip is charged in full.

Select a vehicle
Trips by volume1

Your delivery estimate

Choose a district, volume and distance from loading point to site.

Preliminary estimate using indicative rates. Materials and additional work are charged separately. Final terms are confirmed by the manager. Trips are calculated by body volume; actual loading depends on material and permitted mass.

Unsure of volume? Calculate it from layer dimensions
PRELIMINARY VOLUME

How much material do you need?

Geometric layer volume. Compaction, allowances and density are considered separately.

××
Layer volume10 m³
Illustration of a four-axle FAW with a covered 25 m³ body approaching a construction site
Delivery to site

What affects delivery cost?

Route, volume, vehicle and unloading determine the final cost. Send an exact address or landmark, access restrictions and preferred date. Price and schedule can be agreed once details are clarified.

Prepare the unloading area

Check access width, surface and turning space. Consider gates, overhead wires and other obstacles. The selected equipment must work safely. For garden communities, confirm entry rules and seasonal restrictions in advance.

One address or several stages

For regular supply, provide total volume and expected schedule. Trip availability, minimum load and splitting the order are discussed with the estimate. Do not request all material at once if the site cannot receive it.

01

Select the material

We clarify the task, specifications and required volume.

02

Calculate the supply

We consider the address, route and access conditions.

03

Agree the details

We confirm price, documents and receiving time.

04

Arrange delivery

Materials arrive on the agreed terms.

MATERIALS · MACHINERY · PROJECTS

Applications

What to consider when selecting materials and arranging delivery.

Illustration of an industrial yard filled with crushed stone: a four-axle FAW 25 m³ and a roller beside a warehouse
INDUSTRIAL SITES

Warehouse yard

Contractor supplies are agreed against the specification, work stages and receiving schedule.

Fleet illustration: four-axle FAW trucks with 25 m³ bodies in a quarry
MACHINERY

FAW for bulk deliveries

Four axles and a 25 m³ body. Loading is agreed according to material density and permitted weight.

Illustration of a four-axle FAW 25 m³ unloading sand and gravel and a roller at work
SITE PREPARATION

Filling and grading

The estimate considers area, layer thickness, material and on-site compaction conditions.

Illustration of topsoil and a residential development being prepared for landscaping
LANDSCAPING

Soil for landscaping

We clarify the soil's purpose, required volume and a suitable stockpiling area on site.

Illustration: Quarried aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Quarried aggregate

A task-specific load: quarried aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sand delivery, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sand delivery

A task-specific load: sand delivery. Composition, quantity and unloading are agreed before dispatch.

Illustration: Soil for landscaping, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Soil for landscaping

A task-specific load: soil for landscaping. Composition, quantity and unloading are agreed before dispatch.

Illustration: Asphalt for roadworks, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Asphalt for roadworks

A task-specific load: asphalt for roadworks. Composition, quantity and unloading are agreed before dispatch.

Illustration: Millings for access roads, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Millings for access roads

A task-specific load: millings for access roads. Composition, quantity and unloading are agreed before dispatch.

Illustration: Graded recycled aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Graded recycled aggregate

A task-specific load: graded recycled aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Concrete rubble and processing, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Concrete rubble and processing

A task-specific load: concrete rubble and processing. Composition, quantity and unloading are agreed before dispatch.

Illustration: Brick rubble, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Brick rubble

A task-specific load: brick rubble. Composition, quantity and unloading are agreed before dispatch.

Illustration: Coarse asphalt rubble, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Coarse asphalt rubble

A task-specific load: coarse asphalt rubble. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sand and gravel mix, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sand and gravel mix

A task-specific load: sand and gravel mix. Composition, quantity and unloading are agreed before dispatch.

Illustration: Gravel aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Gravel aggregate

A task-specific load: gravel aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Limestone aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Limestone aggregate

A task-specific load: limestone aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Fine screenings, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Fine screenings

A task-specific load: fine screenings. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sandy loam for specified fill, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sandy loam for specified fill

A task-specific load: sandy loam for specified fill. Composition, quantity and unloading are agreed before dispatch.

Illustration: Trenches and utilities with machinery and FAW 25 m³
PREPARATION STAGES

Trenches and utilities

Work scenario: trenches and utilities. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Site grading with machinery and FAW 25 m³
PREPARATION STAGES

Site grading

Work scenario: site grading. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Raising site levels with machinery and FAW 25 m³
PREPARATION STAGES

Raising site levels

Work scenario: raising site levels. Design levels, access, sequencing and acceptance guide the scope.

Illustration: On-site soil movement with machinery and FAW 25 m³
PREPARATION STAGES

On-site soil movement

Work scenario: on-site soil movement. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Winter access clearing with machinery and FAW 25 m³
PREPARATION STAGES

Winter access clearing

Work scenario: winter access clearing. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Base compaction with machinery and FAW 25 m³
PREPARATION STAGES

Base compaction

Work scenario: base compaction. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Preserving topsoil with machinery and FAW 25 m³
PREPARATION STAGES

Preserving topsoil

Work scenario: preserving topsoil. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Temporary road materials with machinery and FAW 25 m³
PREPARATION STAGES

Temporary road materials

Work scenario: temporary road materials. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Road slab bedding with machinery and FAW 25 m³
PREPARATION STAGES

Road slab bedding

Work scenario: road slab bedding. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Drainage layer preparation with machinery and FAW 25 m³
PREPARATION STAGES

Drainage layer preparation

Work scenario: drainage layer preparation. Design levels, access, sequencing and acceptance guide the scope.

QUESTIONS AND ANSWERS

Before your first delivery

How do I get a delivered price?

Enter the material, particle size, volume and site address in the quotation form. Price depends on material properties, route and unloading conditions. Final terms are agreed before ordering.

Which units should I use?

You can specify cubic metres or tonnes. If you only know the layer dimensions, use the volume calculator. Converting mass to volume depends on the bulk density of the particular material.

Can a business order materials?

Yes. Send your specification, company details and schedule. Contract, tax terms, payment arrangements and documents are agreed when preparing the quotation.

What should I check before the dump truck arrives?

Access, gate width, turning space, surface condition and unloading area. Tell us about weight, height and entry-time restrictions.

HAVE A TASK? LET US FIND A SOLUTION

Let us start with your site

Tell us the material, volume and address. We will clarify the rest together.

Call us