Saint Petersburg and Leningrad Regioninfo@sirius-nerud.ru
Sirius GroupMATERIALS. MACHINERY.
CONSTRUCTION SOLUTIONS.
+7 (812) 502-14-52Discuss your project
SIRIUS GROUP · SAINT PETERSBURG & LENINGRAD REGION

Personal data processing policy

This policy describes processing of visitor data submitted to TD SIRIUS-GROUP LLC through the website for material, delivery, service and equipment hire estimates.

Controller and contacts

Controller: TD SIRIUS-GROUP LLC, INN 7816761041, KPP 781601001, OGRN 1257800111909. Registered address: 192283, Saint Petersburg, Budapeshtskaya St., 97, building 2, letter A, premises 10-N. Data processing enquiries: info@sirius-nerud.ru. Phone: +7 (812) 502-14-52.

Purpose and enquiry data

Data is used to review enquiries, contact applicants, prepare estimates and agree potential supply or service terms. The form asks for name, phone, material or service, quantity, unit and site address; email and comments are optional. Transferred delivery calculations add district, distance, trips and preliminary total to the comment. Enquiry number, time, consent and processing status are also recorded.

Do not include passport, health or other information unnecessary for the estimate. Advertising mailings are not a purpose of this form.

Legal basis and processing methods

Enquiries are processed with applicant consent. Where a contract is concluded, contractual and statutory grounds may also apply. Processing includes collection, recording, storage, correction, use for response, access restriction and deletion. Enquiries are stored in the website server database and are not published publicly.

Access, transfer and retention

Authorised personnel access enquiries for their duties through a protected account. Third-party transfer requires a lawful basis and is limited to what is necessary. Any processing contractors must have defined confidentiality and data-protection obligations.

Data is processed as long as needed to handle the enquiry and agree terms. Once the purpose is achieved or consent withdrawn, processing stops and data is deleted unless another lawful basis requires retention. Contract documents follow mandatory retention periods.

Technical data

The connection IP address is used to protect forms from excessive requests. A functional cookie is used for administrator authentication. This policy must be updated if services or processing purposes change.

Requests and applicant rights

You may request information about processing, correction, restriction or deletion, and withdraw consent. Send a request to info@sirius-nerud.ru or the controller's registered address. Include the contact used for the enquiry so it can be found. If ownership verification is needed, the controller will notify you separately. Requests are handled within statutory time limits.

Revision date: 23 October 2026.

MATERIALS · MACHINERY · PROJECTS

Applications

What to consider when selecting materials and arranging delivery.

Fleet illustration: four-axle FAW trucks with 25 m³ bodies in a quarry
MACHINERY

FAW for bulk deliveries

Four axles and a 25 m³ body. Loading is agreed according to material density and permitted weight.

Illustration of a four-axle FAW 25 m³ unloading sand and gravel and a roller at work
SITE PREPARATION

Filling and grading

The estimate considers area, layer thickness, material and on-site compaction conditions.

Illustration of a four-axle FAW with a covered 25 m³ body approaching a construction site
LOGISTICS

Delivery to site

We confirm the route, entry requirements, turning space and unloading location before dispatch.

Illustration of an industrial yard filled with crushed stone: a four-axle FAW 25 m³ and a roller beside a warehouse
INDUSTRIAL SITES

Warehouse yard

Contractor supplies are agreed against the specification, work stages and receiving schedule.

Illustration of topsoil and a residential development being prepared for landscaping
LANDSCAPING

Soil for landscaping

We clarify the soil's purpose, required volume and a suitable stockpiling area on site.

Illustration: Quarried aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Quarried aggregate

A task-specific load: quarried aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sand delivery, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sand delivery

A task-specific load: sand delivery. Composition, quantity and unloading are agreed before dispatch.

Illustration: Soil for landscaping, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Soil for landscaping

A task-specific load: soil for landscaping. Composition, quantity and unloading are agreed before dispatch.

Illustration: Asphalt for roadworks, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Asphalt for roadworks

A task-specific load: asphalt for roadworks. Composition, quantity and unloading are agreed before dispatch.

Illustration: Millings for access roads, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Millings for access roads

A task-specific load: millings for access roads. Composition, quantity and unloading are agreed before dispatch.

Illustration: Graded recycled aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Graded recycled aggregate

A task-specific load: graded recycled aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Concrete rubble and processing, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Concrete rubble and processing

A task-specific load: concrete rubble and processing. Composition, quantity and unloading are agreed before dispatch.

Illustration: Brick rubble, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Brick rubble

A task-specific load: brick rubble. Composition, quantity and unloading are agreed before dispatch.

Illustration: Coarse asphalt rubble, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Coarse asphalt rubble

A task-specific load: coarse asphalt rubble. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sand and gravel mix, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sand and gravel mix

A task-specific load: sand and gravel mix. Composition, quantity and unloading are agreed before dispatch.

Illustration: Gravel aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Gravel aggregate

A task-specific load: gravel aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Limestone aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Limestone aggregate

A task-specific load: limestone aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Fine screenings, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Fine screenings

A task-specific load: fine screenings. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sandy loam for specified fill, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sandy loam for specified fill

A task-specific load: sandy loam for specified fill. Composition, quantity and unloading are agreed before dispatch.

Illustration: Trenches and utilities with machinery and FAW 25 m³
PREPARATION STAGES

Trenches and utilities

Work scenario: trenches and utilities. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Site grading with machinery and FAW 25 m³
PREPARATION STAGES

Site grading

Work scenario: site grading. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Raising site levels with machinery and FAW 25 m³
PREPARATION STAGES

Raising site levels

Work scenario: raising site levels. Design levels, access, sequencing and acceptance guide the scope.

Illustration: On-site soil movement with machinery and FAW 25 m³
PREPARATION STAGES

On-site soil movement

Work scenario: on-site soil movement. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Winter access clearing with machinery and FAW 25 m³
PREPARATION STAGES

Winter access clearing

Work scenario: winter access clearing. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Base compaction with machinery and FAW 25 m³
PREPARATION STAGES

Base compaction

Work scenario: base compaction. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Preserving topsoil with machinery and FAW 25 m³
PREPARATION STAGES

Preserving topsoil

Work scenario: preserving topsoil. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Temporary road materials with machinery and FAW 25 m³
PREPARATION STAGES

Temporary road materials

Work scenario: temporary road materials. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Road slab bedding with machinery and FAW 25 m³
PREPARATION STAGES

Road slab bedding

Work scenario: road slab bedding. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Drainage layer preparation with machinery and FAW 25 m³
PREPARATION STAGES

Drainage layer preparation

Work scenario: drainage layer preparation. Design levels, access, sequencing and acceptance guide the scope.

Visitor statistics and your choice

With your permission this website uses Yandex Metrica and Google Analytics 4 to collect technical visit and event statistics, such as opening the calculator or clicking a contact link. These services use cookies. Additional advertising data sharing and form-content recording are disabled. Our analytics code does not send your name, phone, email, project address or enquiry text.

External analytics tags do not load before you allow them. Your choice is saved on this device for 180 days and can be changed using Analytics settings in the footer. Declining does not restrict forms or the calculator. Google Analytics is an external Google service; visit information is also processed by that provider’s infrastructure. To attribute visits from Yandex Direct, only a valid numeric yclid click identifier is retained; other URL parameters and the fragment are removed by our loader. Opening the enquiry form separately loads Google reCAPTCHA to protect against automated submissions. This service processes technical browser information under Google’s privacy policy; our server does not send enquiry field contents to Google. Declining analytics does not disable form protection.

Call us