
Delivery to site
We confirm the route, entry requirements, turning space and unloading location before dispatch.
Recycled asphalt millings. We calculate material and delivery in Saint Petersburg and the region based on volume, address and batch requirements.
Delivery from 25 m³ in Saint Petersburg and Leningrad Region.

Specify site purpose, quantity and address. Reclaimed asphalt material comes from crushing or milling pavement. If specifically required directly from milling, state this: production method, grading and availability are confirmed separately.
Millings are considered where recycled asphalt is permitted. Confirm loading, base, drainage, spreading and compaction method. Results depend on the entire structure; the material is not equivalent to new asphalt mix.
For private and garden-community roads, entrance width, truck turning space and receiving hours also matter. Describe conditions before trip planning, particularly for narrow or unprepared roads.
Geometric volume is area in m² multiplied by thickness in metres. For example, 100 m² at 0.10 m gives 10 m³. This is a calculation example, not a recommended thickness or final purchasing quantity: layer parameters and compaction allowance follow the work method.
Converting to tonnes requires batch density and the measurement method. Do not use one per-square-metre quantity for every thickness. Calculate geometry with the volume and delivery calculator; the calculation process is explained in the site filling guide.
Material price depends on batch preparation, condition, quantity and sales unit. Delivered prices also consider loading point, address and unloading. The calculator covers transport only; millings price and full order total are confirmed separately.
Our main trucks are four-axle FAW vehicles with 25 m³ bodies. This is body capacity, not a guaranteed load volume for every material: permitted mass also limits loading. Before arrival, agree access and the unloading location.
Asphalt rubble may contain large pavement fragments. Millings depend on the degree of size reduction; request both batches' properties when comparing.
Material purchase, transport and site work are separate quotation items. Describe any spreading or compaction required so feasibility and price can be agreed.
Compare options with the guide to recycled materials. All products are listed in the main section.
What to consider when selecting materials and arranging delivery.

We confirm the route, entry requirements, turning space and unloading location before dispatch.

Contractor supplies are agreed against the specification, work stages and receiving schedule.

Four axles and a 25 m³ body. Loading is agreed according to material density and permitted weight.

Before dispatch, we confirm stone type, particle size, volume and required material documents.

For a quote, specify the soil volume, loading conditions, site access and agreed receiving location.

Materials for railway works must match the design specification and ballast requirements.

The estimate considers area, layer thickness, material and on-site compaction conditions.

We select sand for the task: filling, base preparation or construction mix requirements.

We agree the composition, volume and application of millings, considering the base and future loading.

We clarify composition, fragment size and allowable inclusions. Recycled material is selected for a specific task.

Design requirements, gravel content and base construction conditions guide mix selection.

We clarify the soil's purpose, required volume and a suitable stockpiling area on site.

Composition, fragment size, loading and acceptance conditions are agreed before trucks arrive.

We clarify snow pile volume, loader access, working hours and the snow receiving location.

Dimensions, design levels and site conditions determine excavation volume and work planning.

A task-specific load: quarried aggregate. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: sand delivery. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: soil for landscaping. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: asphalt for roadworks. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: expanded clay for technical layers. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: separated recycled material streams. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: graded recycled aggregate. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: concrete rubble and processing. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: brick rubble. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: coarse asphalt rubble. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: sand and gravel mix. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: gravel aggregate. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: limestone aggregate. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: fine screenings. Composition, quantity and unloading are agreed before dispatch.

A task-specific load: sandy loam for specified fill. Composition, quantity and unloading are agreed before dispatch.

Work scenario: trenches and utilities. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: construction site preparation. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: site grading. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: raising site levels. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: backfilling around structures. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: on-site soil movement. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: winter access clearing. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: base compaction. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: preserving topsoil. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: temporary road materials. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: road slab bedding. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: drainage layer preparation. Design levels, access, sequencing and acceptance guide the scope.

Work scenario: reinstatement after earthworks. Design levels, access, sequencing and acceptance guide the scope.
Shown

Raise selected zones, prepare access and retain fertile soil for a future garden.
Stages and requirements ↗
Roads, passing places and weak-section repairs with resident access maintained.
Stages and requirements ↗
Prepare a site for parking, turning and heavy vehicle movement.
Stages and requirements ↗
Earthworks for the building, loading docks, emergency access and warehouse yard.
Stages and requirements ↗
Remove excavation soil, supply base materials and coordinate tipper dispatch.
Stages and requirements ↗
Trench preparation, sand bedding, backfilling and surface reinstatement.
Stages and requirements ↗
Aggregate, sand and logistics for agreed railway construction areas.
Stages and requirements ↗
Supply materials and prepare the base for the selected sports surface system.
Stages and requirements ↗
Assess water and subgrade before selecting fill material and quantity.
Stages and requirements ↗Tell us the material, volume and address. We will clarify the rest together.