Saint Petersburg and Leningrad Regioninfo@sirius-nerud.ru
Sirius GroupMATERIALS. MACHINERY.
CONSTRUCTION SOLUTIONS.
+7 (812) 502-14-52Discuss your project
SIRIUS GROUP · SAINT PETERSBURG & LENINGRAD REGION

Soil

Materials for site grading, filling and preparation of a fertile soil layer.

Illustration: Soil for landscaping, four-axle FAW 25 m³
Soil for landscaping

Soil for your site

Grading a site and forming a fertile layer serve different purposes. Raising ground levels requires consideration of the base, drainage and future loading; planting requires suitable composition. Filling alone does not replace a drainage design.

Preparing an enquiry

Specify purpose, site area and planned layer thickness. If levels change, provide quantities by zone. Tell us whether a dump truck can reach the unloading point and whether spreading is needed.

Confirm composition, inclusions and offered soil properties before delivery. Agree fertile-layer requirements separately from general grading fill.

MATERIALS · MACHINERY · PROJECTS

Applications

What to consider when selecting materials and arranging delivery.

Fleet illustration: four-axle FAW trucks with 25 m³ bodies in a quarry
MACHINERY

FAW for bulk deliveries

Four axles and a 25 m³ body. Loading is agreed according to material density and permitted weight.

Illustration of a four-axle FAW 25 m³ unloading sand and gravel and a roller at work
SITE PREPARATION

Filling and grading

The estimate considers area, layer thickness, material and on-site compaction conditions.

Illustration of a four-axle FAW with a covered 25 m³ body approaching a construction site
LOGISTICS

Delivery to site

We confirm the route, entry requirements, turning space and unloading location before dispatch.

Illustration of an industrial yard filled with crushed stone: a four-axle FAW 25 m³ and a roller beside a warehouse
INDUSTRIAL SITES

Warehouse yard

Contractor supplies are agreed against the specification, work stages and receiving schedule.

Illustration of topsoil and a residential development being prepared for landscaping
LANDSCAPING

Soil for landscaping

We clarify the soil's purpose, required volume and a suitable stockpiling area on site.

Illustration: Quarried aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Quarried aggregate

A task-specific load: quarried aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sand delivery, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sand delivery

A task-specific load: sand delivery. Composition, quantity and unloading are agreed before dispatch.

Illustration: Asphalt for roadworks, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Asphalt for roadworks

A task-specific load: asphalt for roadworks. Composition, quantity and unloading are agreed before dispatch.

Illustration: Millings for access roads, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Millings for access roads

A task-specific load: millings for access roads. Composition, quantity and unloading are agreed before dispatch.

Illustration: Graded recycled aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Graded recycled aggregate

A task-specific load: graded recycled aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Concrete rubble and processing, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Concrete rubble and processing

A task-specific load: concrete rubble and processing. Composition, quantity and unloading are agreed before dispatch.

Illustration: Brick rubble, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Brick rubble

A task-specific load: brick rubble. Composition, quantity and unloading are agreed before dispatch.

Illustration: Coarse asphalt rubble, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Coarse asphalt rubble

A task-specific load: coarse asphalt rubble. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sand and gravel mix, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sand and gravel mix

A task-specific load: sand and gravel mix. Composition, quantity and unloading are agreed before dispatch.

Illustration: Gravel aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Gravel aggregate

A task-specific load: gravel aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Limestone aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Limestone aggregate

A task-specific load: limestone aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Fine screenings, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Fine screenings

A task-specific load: fine screenings. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sandy loam for specified fill, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sandy loam for specified fill

A task-specific load: sandy loam for specified fill. Composition, quantity and unloading are agreed before dispatch.

Illustration: Trenches and utilities with machinery and FAW 25 m³
PREPARATION STAGES

Trenches and utilities

Work scenario: trenches and utilities. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Site grading with machinery and FAW 25 m³
PREPARATION STAGES

Site grading

Work scenario: site grading. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Raising site levels with machinery and FAW 25 m³
PREPARATION STAGES

Raising site levels

Work scenario: raising site levels. Design levels, access, sequencing and acceptance guide the scope.

Illustration: On-site soil movement with machinery and FAW 25 m³
PREPARATION STAGES

On-site soil movement

Work scenario: on-site soil movement. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Winter access clearing with machinery and FAW 25 m³
PREPARATION STAGES

Winter access clearing

Work scenario: winter access clearing. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Base compaction with machinery and FAW 25 m³
PREPARATION STAGES

Base compaction

Work scenario: base compaction. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Preserving topsoil with machinery and FAW 25 m³
PREPARATION STAGES

Preserving topsoil

Work scenario: preserving topsoil. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Temporary road materials with machinery and FAW 25 m³
PREPARATION STAGES

Temporary road materials

Work scenario: temporary road materials. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Road slab bedding with machinery and FAW 25 m³
PREPARATION STAGES

Road slab bedding

Work scenario: road slab bedding. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Drainage layer preparation with machinery and FAW 25 m³
PREPARATION STAGES

Drainage layer preparation

Work scenario: drainage layer preparation. Design levels, access, sequencing and acceptance guide the scope.

FROM PRIVATE PLOTS TO INFRASTRUCTURE

Project types and work stages

All 24 project types ↗
HAVE A TASK? LET US FIND A SOLUTION

Let us start with your site

Tell us the material, volume and address. We will clarify the rest together.

Call us