Saint Petersburg and Leningrad Regioninfo@sirius-nerud.ru
Sirius GroupMATERIALS. MACHINERY.
CONSTRUCTION SOLUTIONS.
+7 (812) 502-14-52Discuss your project
SIRIUS GROUP · SAINT PETERSBURG & LENINGRAD REGION

Recycled materials with delivery

Asphalt millings, recycled aggregate and construction rubble. Compare options and request a material and delivery quote for your site in Saint Petersburg or Leningrad Region.

Illustration: Separated recycled material streams, four-axle FAW 25 m³
Separated recycled material streams

Which recycled material does your site need?

Temporary roads, grading and bases may require different materials. Start with layer purpose and design requirements: millings, crushed aggregate and coarse rubble differ in composition, particle size and preparation.

  • Asphalt millings — recycled asphalt pavement. Confirm production method, grading and batch condition.
  • Recycled aggregate — crushed recycled material. Original feedstock, grading and allowable inclusions matter.
  • Concrete rubble — concrete fragments with agreed sizes, preparation and limits on residual reinforcement.
  • Brick rubble — brick fragments whose composition and suitability are checked for the task.
  • Asphalt rubble — fragments of removed pavement, coarser than millings and requiring separate preparation agreement.

Delivered prices for recycled materials

Material and transport are calculated separately. Price depends on batch composition and preparation, order quantity, loading point, address and unloading. State whether you need a price per cubic metre, tonne or whole order. Compare the same unit and scope.

For a preliminary transport estimate, use the delivery calculator for Saint Petersburg and Leningrad Region districts. It uses a mobilisation fee plus kilometres and excludes materials. Batch availability and final total are confirmed with the enquiry.

Site filling, temporary roads or yards

Specify future loading, base condition and drainage requirements. A graded layer needs prepared material; coarse rubble may require other machinery and additional work. If natural aggregate is required, choose natural stone aggregate. For new asphalt surfacing, see the asphalt section.

FAW dump truck deliveries

Our fleet is mainly four-axle FAW trucks with 25 m³ bodies. Actual quantity per trip also depends on mass and permitted payload. Provide the exact address, entry conditions and unloading area; agree receiving order for multiple trips. Prepare with our dump truck access checklist.

Questions before ordering

Can I simply order rubble?

Specify concrete, brick or asphalt. The general term does not define composition, fragment size or preparation, all of which are needed for comparable quotes.

Which is more economical: millings, rubble or recycled aggregate?

Compare the complete solution: material, transport, spreading and site preparation. The lowest price per cubic metre does not always mean the lowest overall cost.

Compare options with the guide to recycled materials. All products are listed in the main section.

5 MATERIALS / DIFFERENT TASKS

Choose the specific recycled material

AI-generated illustration: Asphalt millings
01 / 05

Asphalt millings

Milled asphalt for specified access roads, yards and surface repairs. Confirm composition and particle size before ordering.

Check before ordering

Requires a prepared base, spreading and compaction, with drainage and loading considered separately. Millings do not replace hot asphalt mix or correct a weak subgrade.

Specifications and uses ↗
AI-generated illustration: Recycled aggregate
02 / 05

Recycled aggregate

Crushed and screened material for technical layers permitted by the design. Unlike coarse rubble, it has a specified grading that must be checked by batch.

Check before ordering

Check origin, grading, inclusions and records. Strength and suitability are task-specific; the material must not automatically be equated with granite aggregate.

Specifications and uses ↗
AI-generated illustration: Concrete rubble
03 / 05

Concrete rubble

Large concrete fragments for agreed technical uses or further processing. Fragment size and reinforcement affect loading and use.

Check before ordering

Agree allowable size, metal inclusions and placement method before supply. Coarse rubble is not a replacement for graded material in a thin levelling layer.

Specifications and uses ↗
AI-generated illustration: Brick rubble
04 / 05

Brick rubble

Brick fragments for selected technical fill uses when specified. Brick rubble and mixed construction waste are separate streams.

Check before ordering

Assess uniformity, mortar content and foreign inclusions. Moisture and loads may restrict use; structural bases require design justification.

Specifications and uses ↗
AI-generated illustration: Asphalt rubble
05 / 05

Asphalt rubble

Pieces of removed pavement, distinct from fine millings. Agree use, size and any need for crushing before supply.

Check before ordering

Large fragments may need processing for a uniform layer. Confirm impurities and site suitability; rubble is not supplied as a finished road surface.

Specifications and uses ↗
MATERIALS · MACHINERY · PROJECTS

Applications

What to consider when selecting materials and arranging delivery.

Illustration of a four-axle FAW 25 m³ unloading sand and gravel and a roller at work
SITE PREPARATION

Filling and grading

The estimate considers area, layer thickness, material and on-site compaction conditions.

Fleet illustration: four-axle FAW trucks with 25 m³ bodies in a quarry
MACHINERY

FAW for bulk deliveries

Four axles and a 25 m³ body. Loading is agreed according to material density and permitted weight.

Illustration of a four-axle FAW with a covered 25 m³ body approaching a construction site
LOGISTICS

Delivery to site

We confirm the route, entry requirements, turning space and unloading location before dispatch.

Illustration of an industrial yard filled with crushed stone: a four-axle FAW 25 m³ and a roller beside a warehouse
INDUSTRIAL SITES

Warehouse yard

Contractor supplies are agreed against the specification, work stages and receiving schedule.

Illustration of topsoil and a residential development being prepared for landscaping
LANDSCAPING

Soil for landscaping

We clarify the soil's purpose, required volume and a suitable stockpiling area on site.

Illustration: Quarried aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Quarried aggregate

A task-specific load: quarried aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sand delivery, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sand delivery

A task-specific load: sand delivery. Composition, quantity and unloading are agreed before dispatch.

Illustration: Soil for landscaping, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Soil for landscaping

A task-specific load: soil for landscaping. Composition, quantity and unloading are agreed before dispatch.

Illustration: Asphalt for roadworks, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Asphalt for roadworks

A task-specific load: asphalt for roadworks. Composition, quantity and unloading are agreed before dispatch.

Illustration: Millings for access roads, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Millings for access roads

A task-specific load: millings for access roads. Composition, quantity and unloading are agreed before dispatch.

Illustration: Graded recycled aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Graded recycled aggregate

A task-specific load: graded recycled aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Concrete rubble and processing, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Concrete rubble and processing

A task-specific load: concrete rubble and processing. Composition, quantity and unloading are agreed before dispatch.

Illustration: Brick rubble, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Brick rubble

A task-specific load: brick rubble. Composition, quantity and unloading are agreed before dispatch.

Illustration: Coarse asphalt rubble, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Coarse asphalt rubble

A task-specific load: coarse asphalt rubble. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sand and gravel mix, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sand and gravel mix

A task-specific load: sand and gravel mix. Composition, quantity and unloading are agreed before dispatch.

Illustration: Gravel aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Gravel aggregate

A task-specific load: gravel aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Limestone aggregate, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Limestone aggregate

A task-specific load: limestone aggregate. Composition, quantity and unloading are agreed before dispatch.

Illustration: Fine screenings, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Fine screenings

A task-specific load: fine screenings. Composition, quantity and unloading are agreed before dispatch.

Illustration: Sandy loam for specified fill, four-axle FAW 25 m³
MATERIALS AND DELIVERY

Sandy loam for specified fill

A task-specific load: sandy loam for specified fill. Composition, quantity and unloading are agreed before dispatch.

Illustration: Trenches and utilities with machinery and FAW 25 m³
PREPARATION STAGES

Trenches and utilities

Work scenario: trenches and utilities. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Site grading with machinery and FAW 25 m³
PREPARATION STAGES

Site grading

Work scenario: site grading. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Raising site levels with machinery and FAW 25 m³
PREPARATION STAGES

Raising site levels

Work scenario: raising site levels. Design levels, access, sequencing and acceptance guide the scope.

Illustration: On-site soil movement with machinery and FAW 25 m³
PREPARATION STAGES

On-site soil movement

Work scenario: on-site soil movement. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Winter access clearing with machinery and FAW 25 m³
PREPARATION STAGES

Winter access clearing

Work scenario: winter access clearing. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Base compaction with machinery and FAW 25 m³
PREPARATION STAGES

Base compaction

Work scenario: base compaction. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Preserving topsoil with machinery and FAW 25 m³
PREPARATION STAGES

Preserving topsoil

Work scenario: preserving topsoil. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Temporary road materials with machinery and FAW 25 m³
PREPARATION STAGES

Temporary road materials

Work scenario: temporary road materials. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Road slab bedding with machinery and FAW 25 m³
PREPARATION STAGES

Road slab bedding

Work scenario: road slab bedding. Design levels, access, sequencing and acceptance guide the scope.

Illustration: Drainage layer preparation with machinery and FAW 25 m³
PREPARATION STAGES

Drainage layer preparation

Work scenario: drainage layer preparation. Design levels, access, sequencing and acceptance guide the scope.

FROM PRIVATE PLOTS TO INFRASTRUCTURE

Project types and work stages

All 24 project types ↗
HAVE A TASK? LET US FIND A SOLUTION

Let us start with your site

Tell us the material, volume and address. We will clarify the rest together.

Call us